Residential renovation
Villa Renovation and Detached House Renewal in İzmir
In İzmir, a villa renovation deals not only with renewing rooms but also with how the floors are used together and how the building relates to outdoor conditions. Assess with ELBASAN YAPI within what limits interior, roof, facade and outdoor work will be combined.

- Experience
- Construction and renovation since 2014
- Site survey
- Free on-site survey and measurement
- Quotation
- An itemised quotation within 48 hours after the on-site measurement
- Workmanship
- 2-year workmanship warranty
- Waterproofing
- 5-year workmanship warranty on waterproofing work; it does not automatically apply to other work or products.
Warranty periods cover workmanship; manufacturers’ product terms and the limits of the work are set out separately in the quotation and contract.
What can change together in a villa?
Several floors, a separate entrance, stairs, terraces and a garden mean that the areas being renovated affect one another. Lines from an upstairs bathroom can change the ceiling below, a terrace threshold the interior floor, and new window and door frames the facade finish. A decision made for a single room must take these connections into account.
The service is for people living in an existing villa, defining the needs of a newly purchased home, or planning interior and exterior work together. Work such as structural intervention, a pool or a new enclosed area is not automatically part of a standard interior renovation; it requires a separate technical assessment and scope.
- Kitchen, bathroom and room layout floor by floor
- Stairs, storage and circulation
- Roof, facade, window and door frame, and terrace junctions
- Garden, shading and outdoor lighting interfaces
At the survey, read the building’s surroundings as well as the interior
Floor dimensions, visible lines, signs of moisture, roof access and how rainwater flows are reviewed. Surfaces exposed to sun and wind may not need the same materials as sheltered ones. The slope of the garden and how the outdoor ground meets the building’s walls also affect the scope of the renovation.
A suspected problem with the structural system is not presented as an item to be solved with ordinary finishing work. A review by the relevant specialist and any required processes are assessed before an intervention decision is made. Existing documents and records of past repairs help the conversation.
Resolve outdoor conditions before interior work
If there is an active leak or a water problem in the facade, the source needs to be dealt with before the interior surfaces are renewed. The sequence is set by the actual damage and scope.
Floors and work list
Areas to be kept, technical reviews and the boundaries between interior and exterior work are set.
Roof, facade and services
Water and heat transfer affecting interior surfaces, and plumbing and wiring work, are assessed.
Interiors and custom work
Floors, doors, the kitchen, the bathroom and built-in furniture proceed with final measurements.
Outdoor use and handover
Garden and terrace transitions, water drainage and installations are checked; maintenance access and outstanding work are recorded.
Insulation, window and door frames, and finishes must not be treated separately
Replacing a window can change how the sill meets the facade insulation. In a roof, the thermal insulation layer and the waterproofing layer do different jobs. Heat and moisture behaviour is not managed just by choosing a thicker product; the connections within the system are assessed.
Inside, stair surfaces, bathroom and kitchen finishes, and cabinet materials are compared against maintenance habits. Outdoors, decking, stone or ceramic tile is chosen according to sun, water drainage and cleaning needs. It is not assumed that every material is suitable for outdoor use.
More than the number of floors sets the budget
Roof and facade access, plumbing and wiring routes, the number of bathrooms, custom dimensions, areas to be protected and outdoor ground work change the budget. Even if garden or pergola work is planned for the same period as the interior renovation, the quotation items should be kept separate.
Write down your priorities by floor and by use. If you will be living in the home, set out which areas can be closed off, which elements must stay accessible for maintenance and who will make product decisions. For projects with high coordination needs, a turnkey approach is assessed separately.
About this service.
Every space has its own conditions. Decisions specific to your project become clear once the existing condition has been assessed.
Talk to us about your projectDoes a villa renovation include all outdoor areas?
No. Roof, facade, terrace and garden work is scoped according to needs and the site survey. Work such as a pool, a new structure or structural changes is assessed separately.
Do interior and exterior work have to be done at the same time?
Not always. Dependencies such as a leak affecting interior surfaces should be resolved first; independent work can be phased according to use and supply conditions.
In a villa, should the window and door frames or the facade be renewed first?
The sill, the return of the insulation and the installation gap should be resolved together. The sequence of work is planned according to the chosen systems; the same sequence is not assumed for every building.
Related services.
Home renovation
Rooms, floors, doors and the existing services are assessed together according to how the home is used.Kitchen renovation
Cabinets, worktops and appliances are laid out together with the electrical and water connections.Bathroom renovation
Water lines, waterproofing, drains and tiling are handled in line with the bathroom’s dimensions and how it is used.Garden design
Plants, soil, irrigation, drainage and paths are planned around the garden’s sun conditions, use and maintenance capacity.
Let’s assess your project together.
Share your current space and the changes you have in mind. We will talk through your needs, the scope and the next step.