Residential renovation
Kitchen Renovation in İzmir
Plan your kitchen renovation in İzmir with ELBASAN YAPI around food preparation, storage, appliance placement and connection points. Cabinet production and plumbing and electrical decisions should rest on the same measured layout.

- Experience
- Construction and renovation since 2014
- Site survey
- Free on-site survey and measurement
- Quotation
- An itemised quotation within 48 hours after the on-site measurement
- Workmanship
- 2-year workmanship warranty
- Waterproofing
- 5-year workmanship warranty on waterproofing work; it does not automatically apply to other work or products.
Warranty periods cover workmanship; manufacturers’ product terms and the limits of the work are set out separately in the quotation and contract.
A kitchen layout starts with how you cook
The relationship between the prep counter, the sink and the cooking zone decides how a kitchen works. How many people cook at the same time, how you store things and whether you need a table should all be reflected in the layout.
An island is not right for every kitchen. There must be enough room to open doors, use appliances and move through the space.
Fix appliance dimensions before production
The dimensions of the oven, fridge, dishwasher and cooker hood shape the cabinet design. Water, drain and electrical points are coordinated with the appliances. An appliance changed after the cabinets are ordered can mean reworking the whole layout.
- Appliance list and technical dimensions
- Worktop material and joint details
- Interior cabinet organisation and access
- Under-cabinet task lighting
Square metres alone do not set the budget
Door and carcass materials, hinge and drawer systems, the choice of worktop, custom dimensions, and relocating plumbing and wiring all affect the cost. Comparing quotations on the same product specifications and scope of work leads to a sounder decision.
At the survey, measurements and connections come before looks
Counter height under a window, radiators, door swings and the cooker hood outlet limit the layout options. The drain route for the sink and dishwasher and the connection needs of the oven and hob are reviewed against the appliance documentation. Any work on a gas line is assessed separately through the relevant authorised process.
Sometimes only new doors are needed; but if the carcass, edges and hardware are not sound, new doors will not solve the underlying problem. No production decision is made before checking that the new product works with the existing system.
- Prep space and room for small appliances on the counter
- Separate storage for food, cookware and cleaning products
- Drawers and doors that open without clashing
- Access to appliances for service and maintenance
Choose cabinets and worktops as one system
MDF or particleboard carcasses, lacquered or veneered doors, hinges and drawer runners must all handle the same daily load. Around damp areas the material name alone is not enough; edge banding, the sink cutout and joint protection matter as well.
Worktop options such as quartz, granite, porcelain and compact laminate are compared by product properties, resistance to stains and heat, maintenance and edge details. We do not assume that every natural stone needs the same care, or that any surface will never stain. The maintenance guidance for the chosen product is what counts.
Match cabinet production with work on site
How long the kitchen will be out of use is set by looking at removal, tiling, cabinet production and worktop supply together. Discuss any need for temporary cooking arrangements at the start.
Layout and product approval
Appliance make and model dimensions, interior cabinet organisation and the worktop choice are finalised.
Removal and connection preparation
Water, drain, electrical and ventilation outlets are reviewed against the plan; any necessary surface corrections are made.
Cabinets and worktop
Cabinet installation is coordinated with final measurement and production of the chosen worktop.
Final installation and checks
Appliance access, sink connections, door and drawer movement, and counter lighting are checked together.
Complete the product list before the quotation
The budget depends as much on custom interior fittings, door finish, drawer runners and hinges, worktop cutouts, relocating services and new tiling as on the length of the cabinets. State who is buying the cabinets, worktop and appliances, and compare quotations on the same product specifications.
Counter lighting does not replace the general ceiling light. The cook’s shadow should not fall across the prep area, and the LED driver must stay accessible for maintenance. Not every choice has to be made at once, but decisions that affect production must be settled before ordering.
Our work in this area
About this service.
Every space has its own conditions. Decisions specific to your project become clear once the existing condition has been assessed.
Talk to us about your projectCan the existing cabinets be kept?
We check the condition of the carcasses, the dimensions and whether they suit the new layout. Replacing only the doors may not solve a carcass that is not sound or a lack of usable space.
When is the worktop measured?
The final measurement is usually taken once the base cabinets are in place. The production and installation requirements of the chosen material should be built into the work programme.
Is a large kitchen enough for an island?
No. Door and appliance clearances, circulation, seating and any connections that would need to move to the island are checked on the plan. A peninsula or a separate prep counter may suit the room better.
Are cabinet installation and appliance warranties the same thing?
Installation workmanship carries a 2-year warranty. Manufacturers’ terms for appliances and other products are assessed separately; this period is not a product warranty covering every appliance.
Related services.
Home renovation
Rooms, floors, doors and the existing services are assessed together according to how the home is used.Custom furniture
For custom cabinets, shelving and built-in units, dimensions, carcasses and doors, hardware and installation junctions are decided together.Plumbing renewal
Water and drain lines, valve and tap connections, and inspection stages are planned around the existing system and new points of use.Electrical rewiring
Appliance loads, wiring and the distribution board, protection, sockets and lighting points are addressed through a technical assessment and the pattern of use.
Let’s assess your project together.
Share your current space and the changes you have in mind. We will talk through your needs, the scope and the next step.