Electrical Rewiring in İzmir

New appliances, a changed layout or problems in existing wiring may call for the electrical infrastructure to be assessed. Plan the scope of the renewal in İzmir with ELBASAN YAPI based on the appliance list, a technical inspection and the points of use.

Architectural detail drawing showing material junctions and dimension linesConcept image
Concept drawing · Not a photograph of a real project.
Experience
Construction and renovation since 2014
Site survey
Free on-site survey and measurement
Quotation
An itemised quotation within 48 hours after the on-site measurement
Workmanship
2-year workmanship warranty
Waterproofing
5-year workmanship warranty on waterproofing work; it does not automatically apply to other work or products.

Warranty periods cover workmanship; manufacturers’ product terms and the limits of the work are set out separately in the quotation and contract.

From a new socket to the entire infrastructure

Too few sockets, changed appliance loads or problems with old wiring each call for different work. The distribution board, circuits, sockets and switches, lighting and data routes are reviewed within the same plan of use; none of them is automatically replaced entirely.

  • Appliance and power requirements
  • Assessment of wiring, circuits and the distribution board
  • Review of protection and earthing
  • Socket, data, and lighting points and surface repair

The survey is not limited to a visual check

Existing documents, the appliance list, usage habits and known faults are shared. The suitability of cables, connections and the protection arrangement is determined through measurement and assessment by the relevant authorised specialists. It is not assumed that everything inside the walls can be understood from photographs.

Symptoms such as circuit breakers tripping repeatedly or sockets heating up require inspection by a relevant specialist. Line capacity and connection decisions are not based on the number of products alone.

Technical decisions and maintenance access

Conductors and cables, protective devices, circuit distribution and earthing are assessed as one system. Cable sizes and protection ratings are set by the load in use and a technical assessment. Damp or outdoor conditions and data and power interfaces are included in the installation plan.

Distribution board labels, access to connections and circuit information are important for maintenance. Responsibilities for supplying and commissioning special equipment, networks or automation should be kept separate from the building work. Responsibility for maintenance and any necessary checks during use should also be defined.

Shutdowns, installation and checks

Power shutdowns and the work area are planned by the relevant authorised team; points that will be out of use and the shutdown periods are set at the start.

  1. Use and technical scope

    Loads, points, documents and the necessary inspections are identified.

  2. Routes and infrastructure

    Lines, the distribution board and work on surfaces are coordinated with other work.

  3. Installation and measurement

    Connection and protection checks are carried out by the relevant specialists in line with their scope.

  4. Surfaces and use

    Repairs within the scope, labels and technical information are reviewed; work on the business’s own equipment is completed separately.

Work that does not show in the quotation

Line length, the number of points, distribution board requirements, cable routes, opening and repairing surfaces, and downtime affect the cost. List socket and light fitting supply, measurement and records, and active data equipment as separate items. Access and connection decisions should be settled before furniture or suspended ceilings close them in.

About this service.

Every space has its own conditions. Decisions specific to your project become clear once the existing condition has been assessed.

Talk to us about your project
Is running a new line enough to add sockets?

The existing load, circuits and protection arrangement must be assessed. The necessary work is determined through an authorised technical inspection.

Can data cabling be part of the same scope?

It can; responsibilities for routes, connections, active equipment and commissioning are defined separately. Electrical work does not automatically include all of these.

Can painting be done first?

If surfaces need to be opened and services need work, painting is usually planned after that work. The actual scope and the limits of repair determine the sequence of work.