Building and repair
Electrical Rewiring in İzmir
New appliances, a changed layout or problems in existing wiring may call for the electrical infrastructure to be assessed. Plan the scope of the renewal in İzmir with ELBASAN YAPI based on the appliance list, a technical inspection and the points of use.
- Experience
- Construction and renovation since 2014
- Site survey
- Free on-site survey and measurement
- Quotation
- An itemised quotation within 48 hours after the on-site measurement
- Workmanship
- 2-year workmanship warranty
- Waterproofing
- 5-year workmanship warranty on waterproofing work; it does not automatically apply to other work or products.
Warranty periods cover workmanship; manufacturers’ product terms and the limits of the work are set out separately in the quotation and contract.
From a new socket to the entire infrastructure
Too few sockets, changed appliance loads or problems with old wiring each call for different work. The distribution board, circuits, sockets and switches, lighting and data routes are reviewed within the same plan of use; none of them is automatically replaced entirely.
- Appliance and power requirements
- Assessment of wiring, circuits and the distribution board
- Review of protection and earthing
- Socket, data, and lighting points and surface repair
The survey is not limited to a visual check
Existing documents, the appliance list, usage habits and known faults are shared. The suitability of cables, connections and the protection arrangement is determined through measurement and assessment by the relevant authorised specialists. It is not assumed that everything inside the walls can be understood from photographs.
Symptoms such as circuit breakers tripping repeatedly or sockets heating up require inspection by a relevant specialist. Line capacity and connection decisions are not based on the number of products alone.
Technical decisions and maintenance access
Conductors and cables, protective devices, circuit distribution and earthing are assessed as one system. Cable sizes and protection ratings are set by the load in use and a technical assessment. Damp or outdoor conditions and data and power interfaces are included in the installation plan.
Distribution board labels, access to connections and circuit information are important for maintenance. Responsibilities for supplying and commissioning special equipment, networks or automation should be kept separate from the building work. Responsibility for maintenance and any necessary checks during use should also be defined.
Shutdowns, installation and checks
Power shutdowns and the work area are planned by the relevant authorised team; points that will be out of use and the shutdown periods are set at the start.
Use and technical scope
Loads, points, documents and the necessary inspections are identified.
Routes and infrastructure
Lines, the distribution board and work on surfaces are coordinated with other work.
Installation and measurement
Connection and protection checks are carried out by the relevant specialists in line with their scope.
Surfaces and use
Repairs within the scope, labels and technical information are reviewed; work on the business’s own equipment is completed separately.
Work that does not show in the quotation
Line length, the number of points, distribution board requirements, cable routes, opening and repairing surfaces, and downtime affect the cost. List socket and light fitting supply, measurement and records, and active data equipment as separate items. Access and connection decisions should be settled before furniture or suspended ceilings close them in.
About this service.
Every space has its own conditions. Decisions specific to your project become clear once the existing condition has been assessed.
Talk to us about your projectIs running a new line enough to add sockets?
The existing load, circuits and protection arrangement must be assessed. The necessary work is determined through an authorised technical inspection.
Can data cabling be part of the same scope?
It can; responsibilities for routes, connections, active equipment and commissioning are defined separately. Electrical work does not automatically include all of these.
Can painting be done first?
If surfaces need to be opened and services need work, painting is usually planned after that work. The actual scope and the limits of repair determine the sequence of work.
Related services.
Office renovation
Work areas, the meeting layout, and electrical and data infrastructure are planned around the business’s schedule of use.Painting and wall finishes
Surface repair, primer, paint, wallpaper and decorative finishes for interior walls and ceilings are chosen to suit the conditions of use.Lighting design
General, task and accent lighting are chosen with the distribution of light fittings, colour perception, screen reflections and control needs in mind.
Let’s assess your project together.
Share your current space and the changes you have in mind. We will talk through your needs, the scope and the next step.