Commercial renovation
Office Renovation and Workspace Renewal in İzmir
Assess an office renovation in İzmir together with headcount, how people collaborate, meeting needs and the technical infrastructure. In ELBASAN YAPI’s approach, business continuity and maintenance access are as much a part of the plan as the furniture layout.
- Experience
- Construction and renovation since 2014
- Site survey
- Free on-site survey and measurement
- Quotation
- An itemised quotation within 48 hours after the on-site measurement
- Workmanship
- 2-year workmanship warranty
- Waterproofing
- 5-year workmanship warranty on waterproofing work; it does not automatically apply to other work or products.
Warranty periods cover workmanship; manufacturers’ product terms and the limits of the work are set out separately in the quotation and contract.
Layout is considered together with the organisation
In an office, how teams work matters as much as the number of people. Quiet work, meeting, reception and shared areas should be arranged to suit the workflow. The need for future change is also part of the layout assessment.
Comfort and technical infrastructure
Screen reflections, lighting levels and the spread of sound affect the working experience. Electrical and data points and ventilation needs should be handled together with the furniture plan.
- Separating work and meeting areas
- Acoustic and lighting decisions
- Electrical, data and equipment layout
- Maintenance access and storage arrangement
Working while the business carries on
Renovating an office in operation requires a work programme that accounts for dust, noise and interruptions. Phasing options, coordination with building management and safe access routes are reviewed. Night or weekend working conditions should not be assumed; they need to be discussed separately.
The site survey starts with understanding the teams’ day
Setting the number of desks is not a needs analysis on its own. Who works at the same time, which team holds meetings, where are visitors received and where do quiet work and online meetings take place? These questions change decisions on circulation, partitions and shared areas.
Existing desks, server and network equipment, printers, storage, the kitchen and the meeting setup are recorded. If growth or hybrid working is likely, layout options that can adapt without needlessly adding built-in work are assessed.
- The transition between reception and the staff area
- Separating screen work from phone calls
- Meeting capacity and booking habits
- Access to archives, equipment and shared storage
Electrical and data follow from the desk plan
At a workstation, what matters is not only the number of sockets but also device load, the data connection, the cable route and access in case of a fault. Floor box, wall trunking or ceiling distribution options are assessed against the existing floor and services.
Network relocation, power cuts and equipment commissioning are coordinated with the business’s technical staff. Air conditioning, ventilation, and, where present, fire system needs are handled within the project scope of the relevant specialists; an office renovation does not automatically include every system.
Different problems, different systems for acoustics and light
Sound passing out of a meeting room and echo in an open-plan area are not the same problem. The layers and junctions of a partition affect sound transmission; absorbent ceiling and wall surfaces affect reflections within a room. Sound travelling over the ceiling or around a door may not be solved just by adding panels.
Desk positions and light fitting angles are reviewed together with screen reflections. Separate controls can be considered for zones near and far from daylight. Products are chosen on light distribution, glare and maintenance access; a single downlight grid is not applied to the whole office.
Work planned around the business’s schedule
Keeping the office open is a starting condition, not a guaranteed outcome. Until noisy work, escape and access routes, dust separation and interruption needs have been reviewed, it cannot be said that operations will continue at every stage.
Needs and phase plan
It is decided which teams will move where and which areas can be separated.
Partitions and services
Electrical and data work, air conditioning interfaces and work above the ceiling are assessed before surfaces are closed.
Floor, walls and furniture
Cable access, door details and corporate colours are matched with the finish materials.
System and use check
Sockets and connections, light directions, covers and the layout of the meeting area are reviewed; the business’s technical commissioning plan is carried out.
Materials and quotation limits
For heavy foot traffic, LVT or vinyl, carpet or other floorings are compared on maintenance, substrate and acoustic needs. Glass partitions provide transparency; additional decisions on privacy, door sealing, and curtains or film may be needed. Cable outlets for custom desks and cabinets are clarified before production.
Besides the size of the space, the amount of partitioning, work in the ceiling void, network and electrical renewal, custom furniture, staff moves and the number of phases change the budget. In leased premises, the owner, building management and contract terms are assessed with the relevant parties; systems that can be dismantled when moving out are considered separately.
Office project experience
We have renovated offices in Bayraklı and Bornova. For every new office, building management, hours of use, access for deliveries and the condition of existing systems are reviewed again. This way, a scope and working arrangement suited to the new project can be set up.
About this service.
Every space has its own conditions. Decisions specific to your project become clear once the existing condition has been assessed.
Talk to us about your projectCan an office be renovated while it stays open?
The type of work, whether areas can be separated and safety conditions are decisive. Some work may require a temporary closure; phasing is assessed after the site survey.
Why does a new desk layout affect the infrastructure?
Socket and data points, lighting and circulation routes depend on where workstations are placed. Assessing the furniture plan separately from the infrastructure can create extra work later.
Is data infrastructure included in the renovation?
The scope is set by reviewing the condition of the existing network and the new desk plan. Responsibilities for active network devices, cabling, relocation and commissioning should be written down separately, and an interruption plan should be drawn up with the business’s technical team.
Should we choose an open-plan or a partitioned office?
It depends on the need for collaboration and quiet work. A layout that combines open areas with meeting and call rooms can be considered; the amount of partitioning is not chosen on headcount alone.
Can the existing office furniture be used?
It can be kept if its dimensions, condition and cabling needs suit the new layout. A decision on custom pieces should rest on a need of use that the existing furniture does not meet.
How do the site survey and quotation work for an office?
The on-site survey and measurement are free of charge. An itemised quotation is sent within 48 hours after the on-site measurement; this period is not the time needed to carry out or hand over the office work.
Related services.
Floor and wall finishes
Ceramic tile, parquet, vinyl and stone options are compared alongside surface preparation, levels, grout and transition details.Plasterboard and suspended ceiling systems
The ceiling void, boards and framing, lighting, acoustics and service access are resolved together according to partition and ceiling needs.Lighting design
General, task and accent lighting are chosen with the distribution of light fittings, colour perception, screen reflections and control needs in mind.Electrical rewiring
Appliance loads, wiring and the distribution board, protection, sockets and lighting points are addressed through a technical assessment and the pattern of use.
Let’s assess your project together.
Share your current space and the changes you have in mind. We will talk through your needs, the scope and the next step.