Residential renovation
Turnkey Renovation in İzmir
Assess interconnected renovation work in İzmir with ELBASAN YAPI through a shared scope, a procurement plan and defined checkpoints. Turnkey defines which work and which responsibilities are managed together.

- Experience
- Construction and renovation since 2014
- Site survey
- Free on-site survey and measurement
- Quotation
- An itemised quotation within 48 hours after the on-site measurement
- Workmanship
- 2-year workmanship warranty
- Waterproofing
- 5-year workmanship warranty on waterproofing work; it does not automatically apply to other work or products.
Warranty periods cover workmanship; manufacturers’ product terms and the limits of the work are set out separately in the quotation and contract.
What does turnkey cover?
A turnkey renovation brings work that affects other work, such as removal, services, surface finishes and built-in furniture, into one shared scope. Not every project includes the same work. The items left outside the scope need to be written down at the start, just as much as what will be done.
A new kitchen layout can change the electrical wiring, the lighting and the flooring. That is why the way the whole home is used is assessed before individual items of work are chosen.
- Review of the existing condition and a list of needs
- Scope of work and material alternatives
- Work sequence, procurement plan and handover check
Settle decisions before work starts on site
Socket positions, door swings, cabinet dimensions and wet area solutions should be decided together with the working drawings. Decisions that change after production has started can affect both procurement and the work programme.
When assessing a quotation, compare not only the total price but also the product specifications, quantities, the scope of workmanship and how changes will be handled.
Handover is a checking stage
At the final check, surfaces, doors, built-in furniture, and plumbing and wiring connections are reviewed together. Listing outstanding items, sharing maintenance information and checking the scope are all part of the handover. The exact handover conditions are set out in the contract.
One point of contact, clear responsibilities
Having a single point of contact for a project does not mean every piece of work is automatically included. Design, removal, services, product purchasing, delivery, installation and final cleaning are each defined separately. The dimensions and delivery dates of appliances and furniture the client will supply go into the same schedule.
What can be seen at the site survey is kept separate from what lies beneath closed surfaces. A need that comes to light after removal should not turn into extra work without approval; its effect on scope, cost and schedule should be assessed together.
- List of line items and quantities
- Areas to protect and excluded work
- Product approval, ordering and payment responsibilities
- A written record of changes
The sequence of interdependent work
A work programme covers not only the tradespeople’s working days but also product manufacturing, confirmation of final measurements, and drying and inspection intervals.
Scope and decision timeline
It is decided which choices must be settled before the services work and which before production.
Removal and services
After protection and removal work, the exposed lines are assessed; work that will be covered up is checked.
Surfaces and built-in work
Floor levels, cabinet dimensions, door frames and worktop joints are coordinated.
Installation and scope check
Product operation and surface and joint details are checked; remaining work and maintenance information are recorded.
See what coordination covers in the quotation
Similar totals can contain different responsibilities. For example, cabinet installation may be included while worktop measurement, the sink connection or surface repair is left out. Writing product codes, quantities, installation and ancillary work down together makes these gaps visible.
The budget is affected by the number of work items, the existing services, custom manufacturing, supply lead times and the phasing of areas in use. Without confusing a turnkey approach with renovating the entire home, assess the work that genuinely needs coordination within the same scope.
Our work in this area
About this service.
Every space has its own conditions. Decisions specific to your project become clear once the existing condition has been assessed.
Talk to us about your projectWhat is the difference between turnkey and organising separate tradespeople?
In a turnkey approach, the way work items depend on each other is assessed within one scope and schedule. Responsibilities, purchasing decisions and the limits of the scope should be clearly defined in the quotation and contract.
Can I choose the materials myself?
Material preferences need to be assessed together with technical suitability, dimensions and delivery time. Responsibility for selection and purchasing is settled at the start of the project.
Is turnkey only for homes?
No. The same coordination model can also be considered for an office or a commercial space. The type of use determines the technical scope; which work and responsibilities will be handled together is written down separately.
How is a later change in scope assessed?
We identify which work, product orders and steps in the sequence the new need affects. The decision to make the change is recorded together with the updated scope and schedule.
Related services.
Home renovation
Rooms, floors, doors and the existing services are assessed together according to how the home is used.Interior design and decoration
Layout, lighting, colour and material selection are assessed together with installation details.Office renovation
Work areas, the meeting layout, and electrical and data infrastructure are planned around the business’s schedule of use.
Let’s assess your project together.
Share your current space and the changes you have in mind. We will talk through your needs, the scope and the next step.





