Residential renovation
Bathroom Renovation and Wet Area Renewal in İzmir
In a bathroom renovation in İzmir, how water drains away and how it is controlled beneath the surface matter as much as the shower, washbasin and storage. Assess layout, plumbing, waterproofing and installation decisions together with ELBASAN YAPI.

- Experience
- Construction and renovation since 2014
- Site survey
- Free on-site survey and measurement
- Quotation
- An itemised quotation within 48 hours after the on-site measurement
- Workmanship
- 2-year workmanship warranty
- Waterproofing
- 5-year workmanship warranty on waterproofing work; it does not automatically apply to other work or products.
Warranty periods cover workmanship; manufacturers’ product terms and the limits of the work are set out separately in the quotation and contract.
In wet areas, the hidden work is decisive
A bathroom renovation is not just a matter of choosing ceramic tile and taps. Water lines, the drain position, waterproofing details and the slopes in the shower area are assessed together. A good-looking surface does not make up for faulty services.
Old pipes or moisture damage found during removal may require the scope to be reassessed. It is important to discuss such possibilities during the budget conversation.
Why does the sequence of work matter?
Layout decisions, plumbing preparation, surface correction, waterproofing, tiling and installation are consecutive stages. The drying and inspection requirements of the products used must be taken into account; the schedule is not made up of labour time alone.
- Coordination of plumbing and drain points
- Waterproofing joints and installation checks
- Slip risk and surface maintenance needs
- Ventilation and lighting suited to moisture
In small bathrooms every dimension counts
The door swing, washbasin depth, shower entry and storage space should be drawn together. Choosing a larger product does not always make the room more comfortable to use. Access for cleaning and safe movement are part of the decision too.
Leaks, levels and layout at the site survey
The source of an existing damp spot may be the supply line, the drain, a shower joint or another building element. Choosing ceramic tile before the source has been assessed can simply hide the problem from view. The toilet outlet, drain level, service shaft and door threshold are reviewed together with the layout options.
In a home with one bathroom, a solution is needed for the entire period it cannot be used. Not only the removal day but also the waterproofing, drying and installation stages are part of the usage plan. Separating the work area from the other rooms and protecting belongings are discussed at the start.
- Usable space at the shower entry and in front of the washbasin
- Sanitaryware connections and service access to concealed cisterns
- Ventilation route and moisture extraction
- Cabinet door swings and storage for towels and cleaning supplies
Ceramic tile, grout and waterproofing do different jobs
The choice of ceramic tile and grout does not replace the waterproofing beneath the tiling. Wall-to-floor junctions, the area around the drain and pipe penetrations are handled with the details of the chosen system. Whether a liquid-applied or a sheet membrane is used depends on the substrate, movement and product compatibility; the same layer specification is not applied to every bathroom.
The drainage slope of the shower floor and the finished tile level must be set together. Where a step-free shower is wanted, the depth of the existing floor and the drain route are checked. A completely level threshold is not promised before technical suitability has been confirmed.
Work checked before it is covered
Concealed plumbing and waterproofing are stages where later intervention becomes difficult. The drying and inspection conditions of the product used are built into the schedule.
Measurement, protection and removal
The layout is finalised; the condition of the surfaces and old lines exposed by removal is reassessed.
Lines and surface correction
Supply and drain connections are checked, and the floor is prepared to suit the slope and the waterproofing.
Waterproofing and tiling
Corner, penetration and drain details are completed; tiling and grouting proceed after checks suited to the system.
Sanitaryware and cabinets
Taps, the shower screen, the washbasin and the cistern are connected; service access is preserved.
Use check
Water drainage, connections, ventilation, cabinet door movement and lighting are reviewed.
Product choice changes maintenance and budget
Slip risk, contact with water, compatibility with cleaning products and the density of grout lines are part of the tiling decision. Large-format ceramic tiles can mean fewer grout lines in a small bathroom, but this is assessed together with cutting, surface flatness and the drain slope. For cabinets, the edges and the joint with the washbasin matter as much as a moisture-resistant material.
The budget is determined by the size of the room, renewing old lines, layout changes, surface correction, the extent of waterproofing, the grade of ceramic tile and sanitaryware, shower glass and custom cabinets. The shower system and concealed products should be chosen before tiling starts; changing them later affects the services.
Bathroom project experience
Our bathroom work includes residential renovations in Bornova and Bayraklı. This experience does not remove the need to assess the existing lines, dimensions and building conditions of a new project separately.
Our work in this area
About this service.
Every space has its own conditions. Decisions specific to your project become clear once the existing condition has been assessed.
Talk to us about your projectDoes replacing the ceramic tile fix a leak?
The source of a leak may be the plumbing, the waterproofing or a joint detail. Replacing only the tiling without identifying the source may not solve the problem.
How long does a bathroom renovation take?
The scope, the existing services, product supply and drying times all affect the schedule. It would not be right to give an exact duration before the space has been inspected.
Can a near-floor-level shower replace a bath?
It is considered if the drain height, the existing floor, the slope and the waterproofing details allow it. A shower tray or a different threshold solution may be a suitable alternative to unnecessary work on the floor.
What is the warranty period for bathroom waterproofing?
The period for waterproofing workmanship is 5 years; the general workmanship warranty is 2 years. The five-year period does not mean a product warranty covering all sanitaryware, cabinets and taps.
Is repainting enough in a bathroom without ventilation?
The cause of the moisture and how air is extracted should be assessed. Renewing the surface does not, on its own, solve inadequate ventilation or an ongoing leak.
Related services.
Home renovation
Rooms, floors, doors and the existing services are assessed together according to how the home is used.Floor and wall finishes
Ceramic tile, parquet, vinyl and stone options are compared alongside surface preparation, levels, grout and transition details.Lighting design
General, task and accent lighting are chosen with the distribution of light fittings, colour perception, screen reflections and control needs in mind.Plumbing renewal
Water and drain lines, valve and tap connections, and inspection stages are planned around the existing system and new points of use.
Let’s assess your project together.
Share your current space and the changes you have in mind. We will talk through your needs, the scope and the next step.





