Commercial renovation
Factory Renovation in İzmir
In a factory renovation, the priority is deciding how the work will be separated from production and how it will connect to the existing plant systems. Assess the scope of the building renovation in İzmir with ELBASAN YAPI, drawing on input from your production and maintenance teams.
- Experience
- Construction and renovation since 2014
- Site survey
- Free on-site survey and measurement
- Quotation
- An itemised quotation within 48 hours after the on-site measurement
- Workmanship
- 2-year workmanship warranty
- Waterproofing
- 5-year workmanship warranty on waterproofing work; it does not automatically apply to other work or products.
Warranty periods cover workmanship; manufacturers’ product terms and the limits of the work are set out separately in the quotation and contract.
What can a production area renovation include?
A factory renovation may cover worn floors, a leaking roof, building surfaces that have become hard to reach for maintenance or the reorganisation of administrative and staff areas. Moving machinery, modifying process lines and specialised plant systems call for separate expertise and responsibilities; they are not automatically included in a building renovation.
The type of production, shift patterns, material movement, cleaning and working-environment requirements form the basis of the plan. Storage, loading, staff circulation and maintenance areas should be read on the same drawing. The size of the job cannot be explained by total square metres alone.
- Production and warehouse floors and surface repairs
- Roof, facade and rainwater details
- Administrative offices, canteen and changing rooms
- Electrical and mechanical interfaces in the building, depending on scope
The plant’s technical inputs at the survey
Floor loads, wheeled vehicle traffic, chemical contact, temperature, oil and the cleaning method affect the choice of floor finish. Existing damage to the concrete and other surfaces, moisture and joints are examined. The measurements and specialist assessments needed are defined once this information is in hand.
On the roof and facade, we assess access, whether production can continue underneath, material lifting and the need to prevent water ingress. The risk and downtime plan is worked out with the plant’s authorised technical managers; the same working method is not proposed for every factory.
Epoxy or polyurethane alone is not a sufficient specification
The floor product’s system thickness, substrate preparation, moisture conditions, chemical resistance and the conditions for returning the floor to use are reviewed together. A product name does not show suitability for every heavy load. Cracks and joint movement may continue to show through the finish; the repair approach is chosen separately.
Working light, ventilation and plant distribution systems are tied to the production equipment. Their calculations and compliance assessments should be carried out by the relevant specialists. We do not claim that a renovation will deliver an unmeasured percentage gain in overall energy or production efficiency.
Downtime and recommissioning plan
Phasing can be considered if work areas can be safely separated from production. Continued production is not guaranteed at every stage.
Work boundaries and plant inputs
Loads, contact, shifts and equipment to be protected are identified; authorised responsible persons are appointed.
Area separation and preparation
Material traffic, access, the work area and any necessary shutdowns are planned.
Building work
The substrate, floor, roof and facade, and technical interfaces proceed under the conditions of their own systems.
Checks and return to use
Product conditions, building checks and the plant’s recommissioning requirements are assessed together.
The separate needs of administrative and staff areas
Offices, canteens and changing rooms have different use and cleaning patterns from the production floor. Headcount, storage, wet areas and circulation are reviewed. These areas can be renovated within the same programme, but their system and material lists should be built around their own needs.
Quotation and experience
Substrate damage, the preparation method, the floor finish system, roof access, working constraints and the number of phases change the budget. Keep work on production machinery, technical measurements and recommissioning responsibilities separate from the building work.
We have renovated factories in Kemalpaşa, Torbalı and Pınarbaşı. For a new plant, needs related to the type of production and the technical systems are assessed separately.
About this service.
Every space has its own conditions. Decisions specific to your project become clear once the existing condition has been assessed.
Talk to us about your projectCan a factory be renovated without stopping production?
Some areas can be handled in separate phases. Uninterrupted production cannot be promised before safe area separation, shutdowns, product curing and operating conditions have been reviewed.
Is epoxy suitable for every factory floor?
No. Loads, chemical contact, moisture, the substrate and cleaning requirements determine the choice of system; alternatives are compared on their technical properties.
Are changes to machine lines included in the service?
They are not treated as the same scope as a building renovation. Process equipment and machinery work should be defined separately by the relevant specialists and the plant’s technical managers.
Related services.
Office renovation
Work areas, the meeting layout, and electrical and data infrastructure are planned around the business’s schedule of use.Floor and wall finishes
Ceramic tile, parquet, vinyl and stone options are compared alongside surface preparation, levels, grout and transition details.Roof renovation, insulation and repair
Spot repairs, covering renewal, and thermal insulation and waterproofing are assessed with the drainage, chimneys, gutters and existing roof layers.
Let’s assess your project together.
Share your current space and the changes you have in mind. We will talk through your needs, the scope and the next step.