Commercial renovation
Hotel Renovation in İzmir
A hotel renovation is more than a new look for the rooms: guests, housekeeping and technical maintenance use the same space in different ways. Plan room and common-area renovation in İzmir with ELBASAN YAPI alongside the hotel’s operating calendar.
- Experience
- Construction and renovation since 2014
- Site survey
- Free on-site survey and measurement
- Quotation
- An itemised quotation within 48 hours after the on-site measurement
- Workmanship
- 2-year workmanship warranty
- Waterproofing
- 5-year workmanship warranty on waterproofing work; it does not automatically apply to other work or products.
Warranty periods cover workmanship; manufacturers’ product terms and the limits of the work are set out separately in the quotation and contract.
Rooms and common areas do not share one list of needs
In guest rooms the priorities are sleep, luggage, work and bathroom use; in the lobby, welcoming, waiting and wayfinding; in service areas, cleaning and maintenance. A guest bathroom renovation, a furniture replacement and extensive common-area work can be treated separately.
The use the hotel is aiming for and the existing room types are defined at the survey. Before the same furniture is repeated in every room, differences in dimensions, door swings, socket access and cleaning clearances should be checked.
- Room furniture, surfaces and lighting
- Bathroom plumbing, waterproofing and fittings
- Reception, lobby and corridors
- Service and maintenance access
Survey, sample room and operational data
Existing room plans, bathrooms, service lines and points that need frequent maintenance are recorded. Guest movement is reviewed together with the traffic of cleaning supplies and laundry. Fire safety, access and technical system requirements are assessed with the relevant specialists according to the type of hotel and the scope. The necessary operational and technical approval processes are followed separately from the building work.
If many rooms are to be renovated, it may be worth first evaluating use on a sample room or product samples. Alongside visual approval, this evaluation covers socket positions, luggage space, curtain movement and bathroom cleaning.
Material choices affect the maintenance schedule
Under intensive cleaning, surface and edge durability, replaceable parts and compatibility with cleaning products matter. Acoustic decisions distinguish sound passing from the corridor or the neighbouring room from reverberation inside the room. A purely decorative panel does not solve every sound problem.
Bedside reading light, general light and night-time path lighting are separate functions. Access to switches and sockets is checked against bed and furniture dimensions. In bathrooms, waterproofing and plumbing checks are planned before the final finishes.
Phases that work with occupancy
Options for phasing by floor or block are assessed. Unless noise, the material delivery route and shutdowns of shared services are kept apart from guest areas, it cannot be said that the hotel will stay open throughout.
Room types and prototype
Product, layout and maintenance details are finalised on the chosen sample.
Phasing and services
The rooms to be taken out of use, line connections and the service route are determined.
Bathrooms, surfaces and furniture
Wet areas and custom-made items proceed in line with the measurement and supply schedule.
Returning the room to use
Connections, doors and covers, lighting, cleaning access and the hotel’s own use checks are completed.
Budget and the limits of the renovation
The cost is affected by the variety of room types as much as by the number of rooms, along with bathroom services, custom furniture, common-area quantities, the number of phases and usage constraints. It should be stated who will supply textiles, electronic devices, signage and operating equipment.
The off-season may be an option; a suitable schedule is set together with occupancy and supply. If outdoor areas or a restaurant are being renovated in the same programme, their technical decisions are supported by separate service scopes.
About this service.
Every space has its own conditions. Decisions specific to your project become clear once the existing condition has been assessed.
Talk to us about your projectCan every room be renovated from the same drawing?
Room dimensions and the positions of doors and service lines may differ. A shared product language can be kept; room types and critical dimensions should be verified before production.
Can a floor be renovated while the hotel is open?
It depends on whether the phases can be separated, on noise, on service routes and on shutdowns of shared services. It is not assumed that guests can be received throughout all of the work.
Does the five-year warranty in a guest bathroom cover every product?
Five years is the period stated for waterproofing workmanship. General workmanship carries a 2-year warranty; warranty terms for sanitaryware, taps and other products are assessed separately.
Related services.
Bathroom renovation
Water lines, waterproofing, drains and tiling are handled in line with the bathroom’s dimensions and how it is used.Lighting design
General, task and accent lighting are chosen with the distribution of light fittings, colour perception, screen reflections and control needs in mind.Custom furniture
For custom cabinets, shelving and built-in units, dimensions, carcasses and doors, hardware and installation junctions are decided together.Terrace and balcony design
Seating and shade layouts are planned together with thresholds, drains, waterproofing, planters and outdoor surface choices.
Let’s assess your project together.
Share your current space and the changes you have in mind. We will talk through your needs, the scope and the next step.