Commercial renovation
Clinic Renovation in İzmir
In a clinic renovation, waiting, examination, cleaning and equipment use each carry different spatial needs. Assess the renovation scope in İzmir with ELBASAN YAPI based on the healthcare facility’s type of practice and input from its technical managers.

- Experience
- Construction and renovation since 2014
- Site survey
- Free on-site survey and measurement
- Quotation
- An itemised quotation within 48 hours after the on-site measurement
- Workmanship
- 2-year workmanship warranty
- Waterproofing
- 5-year workmanship warranty on waterproofing work; it does not automatically apply to other work or products.
Warranty periods cover workmanship; manufacturers’ product terms and the limits of the work are set out separately in the quotation and contract.
The type of practice sets the layout
Dental clinics, private practices and other healthcare spaces do not have the same needs for equipment, cleaning and patient reception. The transition between the waiting area and the treatment area, staff movement and storage are assessed according to how each space is used.
A renovation can cover reception, examination rooms, wet areas, surfaces and the necessary service lines. Sterilisation, laboratory or specialised equipment systems are not automatically part of every clinic’s scope. The facility’s authorised technical and medical managers should determine which functions are required.
- Link between patient waiting, reception and examination
- Staff and storage areas and the cleaning route
- Electrical, data, water and drainage, and equipment interfaces
- Surface, ceiling, door and privacy details
Equipment and usage data at the survey
The existing plan, equipment technical documents, service clearances, surface condition and cleaning method are reviewed. Fixed built-in units should not be produced until connection and layout dimensions have been matched with the equipment supplier. Ventilation, access, fire safety and licensing requirements are assessed with the relevant specialists and authorities according to the type of practice and the scope of the work.
The facility’s equipment, cleaning and operational approval processes carry responsibilities separate from the building work. The timing of these steps is set together with the facility’s authorised managers.
Cleanability is more than a product name
PVC, vinyl, ceramic tile or other finishes are compared by area of use, cleaning and disinfection method, joints and service conditions. Grout lines, skirting boards, wall corners and worktop cutouts should be designed so that cleaning can reach them. The word “antibacterial” cannot be used without verified product data; appearance is not proof of sterility.
In an examination room, speech privacy depends on door and partition junctions. Waiting-area lighting and task lighting around equipment serve different purposes. Maintenance access must remain above the ceiling, and the chosen surface must be checked for compatibility with the cleaning method.
Separating the work area from patient reception
Whether patients can continue to be seen depends on area separation, dust, noise, shutdowns of shared systems and the facility’s own processes. No general promise of continuity is made.
Needs and specialist input
The type of practice, equipment, functions, and the related approval and acceptance responsibilities are identified.
Isolation and services
The work area, service lines and equipment connections are handled within a safe work programme.
Surfaces and fixed fittings
Work proceeds with cleanable joints, storage and service access checked along the way.
Building and operational checks
Connections and surfaces are checked; the facility’s equipment, cleaning and approval work is completed under its own separate responsibilities.
Quotation and experience
The number of rooms, relocating service lines, the surface system, custom furniture, equipment interfaces and separating the work area change the budget. Set out in writing the boundaries between the building work and medical equipment, specialised installations and operational approval processes.
We have renovated clinics and private practices in Karşıyaka, Bornova, Alsancak and Gaziemir. For a new space, the scope is drawn up separately for its type of practice, equipment and existing structure.
About this service.
Every space has its own conditions. Decisions specific to your project become clear once the existing condition has been assessed.
Talk to us about your projectDoes a clinic renovation guarantee licensing compliance?
No. The specialist assessments required by the type of facility and the scope of the work, and the processes of the relevant authorities, must be carried out separately.
Does every clinic need an epoxy or antistatic floor?
No single surface is assumed for every area. The suitable system is chosen according to the practice, equipment and cleaning requirements; product performance is assessed on the basis of documentation.
When should the equipment supplier get involved?
Before connection points and fixed built-in units are finalised. Later changes to service clearances or dimensions may require rework to services or furniture.
Related services.
Floor and wall finishes
Ceramic tile, parquet, vinyl and stone options are compared alongside surface preparation, levels, grout and transition details.Lighting design
General, task and accent lighting are chosen with the distribution of light fittings, colour perception, screen reflections and control needs in mind.Plumbing renewal
Water and drain lines, valve and tap connections, and inspection stages are planned around the existing system and new points of use.Electrical rewiring
Appliance loads, wiring and the distribution board, protection, sockets and lighting points are addressed through a technical assessment and the pattern of use.
Let’s assess your project together.
Share your current space and the changes you have in mind. We will talk through your needs, the scope and the next step.